If you look back to the last "Updated Plan" I think you'll find most of the items that were layed out there have been completed. There are a few exceptions - begining the wing assembly being the most notable. However, it's always good to have goals, so here are ours:
JUN '07:
1. Finish installing Evaporative cooling unit.
2. Work the day job to make $$ and time-off in JUL for AirVenture.
JUL '07:
1. Work the day job to pay for AirVenture in AUG.
2. Family vacation(s).
3. AirVenture! The entire week!
AUG '07
1. Locate, buy, and ship (or go get) the majority of the metal needed to build our Prowler.
2. Work the day job to pay for AirVenture and metal (see #1.)
3. Begin work in earnest to build parts of our first Prowler:
Dave - Rudder, Elevator, Horz Stab, Vert Stab
Todd - Wing
SEP '07
1. Continue work outlined above.
2. Build a hydraulic power system for the press.
3. Squeeze in time for Reno.
OCT '07
1. Build a better retaining wall and water drainage system behind the shop.
JUN '07:
1. Finish installing Evaporative cooling unit.
2. Work the day job to make $$ and time-off in JUL for AirVenture.
JUL '07:
1. Work the day job to pay for AirVenture in AUG.
2. Family vacation(s).
3. AirVenture! The entire week!
AUG '07
1. Locate, buy, and ship (or go get) the majority of the metal needed to build our Prowler.
2. Work the day job to pay for AirVenture and metal (see #1.)
3. Begin work in earnest to build parts of our first Prowler:
Dave - Rudder, Elevator, Horz Stab, Vert Stab
Todd - Wing
SEP '07
1. Continue work outlined above.
2. Build a hydraulic power system for the press.
3. Squeeze in time for Reno.
OCT '07
1. Build a better retaining wall and water drainage system behind the shop.
No comments:
Post a Comment