Wednesday, December 27, 2006

What's Next??

Next Steps:

Jan '07
1. Finish painting inside of shop and office.
2. Complete inside work (flooring, lighting, etc.)
3. Move into office (desks, computers, bookshelves, etc.)
4. Move into shop (workbenches, tools, shelving, sink, fridge, etc.)

Feb '07
1. Begin to sort through all of the documentation from George
(Manuals, plans, drawings, etc.).
2. Research and build a wing jig.
3. Locate nearest supplier of sheet aluminum.
4. Collaborate w/ Cabi to layout and cut wing spars.
(He's got a plasma cutter - way cool tool!)

Mar '07
1. Repair and install hydraulic press in preparation
for punching out wing ribs.
2. Layout and cut wing ribs.
3. As the weather warms up, finish painting the
exterior of the shop.