Saturday, February 17, 2007

Updated Plan

Feb '07
1. Continue sorting through all of the documentation from George
(Manuals, plans, drawings, etc.).
2. Locate nearest supplier of sheet aluminum.
3. Install downspouts.

Mar '07
1. Build a wing jig.
2. Get hydraulic cylinder rebuilt.
3. Rebuild the press and motor/pump.
4. Layout and cut wing ribs.
5. Practice press forming the wing ribs.
6. Finish shop construction and get final inspection.

Apr '07
1. Collaborate w/ Cabi to layout and cut wing spars.
2. Begin assembling the wing.

No comments: